If you're considering relocating your CT scanner, you're probably already aware the move can save you significant money and improve the care you can deliver across multiple facilities. If it's your first time relocating, however, you may not be aware of all of the steps, requirements, and 'moving parts' of a project like this.
As an equipment and service provider, Iconic Radiology has relocated hundreds of imaging system over the last 10 years
Preparing to Move Your CT Scanner:
Site Preparation:
Itβs crucial to make sure you get appropriate consultation regarding the new space the CT will move into. Electrical and mechanical requirements vary based on the specific model of your CT scanner, so be sure to include an electrician and communicate with them closely throughout your preparations.
Consider these questions:
1)What power connections does your CT require?
2)What are the gantry dimensions, weight, and table movements? Will there be sufficient clearances for all movements?
The Timeline:
-Hire a quality engineer or service organization. Without proper tools, dollies, packaging, and de-installation and installation procedures, a CT relocation can turn into a nightmare quickly.
In the long run, if rooms are ready, there are at least two knowledgeable engineers involved, and transit time is not a factor (or is counted separately), the mechanical side of a CT relocation project commonly takes between three and five days, including de-installation, re-installation, and calibration.
The Cost:
The price for most CT relocations will fall between 1, 50, 000 rs and 5, 00, 000 rs depending on the distance of transit.
As an equipment and service provider, Iconic Radiology has relocated hundreds of imaging system over the last 10 years
Preparing to Move Your CT Scanner:
Site Preparation:
Itβs crucial to make sure you get appropriate consultation regarding the new space the CT will move into. Electrical and mechanical requirements vary based on the specific model of your CT scanner, so be sure to include an electrician and communicate with them closely throughout your preparations.
Consider these questions:
1)What power connections does your CT require?
2)What are the gantry dimensions, weight, and table movements? Will there be sufficient clearances for all movements?
The Timeline:
-Hire a quality engineer or service organization. Without proper tools, dollies, packaging, and de-installation and installation procedures, a CT relocation can turn into a nightmare quickly.
In the long run, if rooms are ready, there are at least two knowledgeable engineers involved, and transit time is not a factor (or is counted separately), the mechanical side of a CT relocation project commonly takes between three and five days, including de-installation, re-installation, and calibration.
The Cost:
The price for most CT relocations will fall between 1, 50, 000 rs and 5, 00, 000 rs depending on the distance of transit.